The settee is converted into a double bunk |
Over the course of almost five years Maciek and I would drive 55 miles to Seabrook, Tx and spend an entire weekend working. On occasion, some friends would lend their helping hand on board and some specialized work would be completed off-site by other friends. To all of them: big thank you!
Scuba tank storage and access to the bilges and is made |
A new, Force 10 propane stove was installed |
Countertops getting a new formica veneer |
A gennaker system was added. Also a brand new set of sails main, rf jib storm trysail and a storm jib had been purchased |
New poly drinking water tanks are taking place of the old aluminum ones |
A new manual windlass and anchor roller system is added |
Windpilot Pacific windvane was installed |
A solar panel bridge and pushpit uniframe with back seats was added. |
A small folding cockpit table was made |
All standing rigging and lifelines were replaced and a Tricolor masthehead navigation light added and the wiring replaced |
The fuel tank received inspection/cleaning ports |
No comments:
Post a Comment