Projects & Refits

The settee is converted into a double bunk
After purchasing Wereda in November of 2004 every weekend was spent on upgrading, refitting and preparing for extended, blue water sailing.
Over the course of almost five years Maciek and I would drive 55 miles to Seabrook, Tx and spend an entire weekend working. On occasion, some friends would lend their helping hand on board and some specialized work would be completed off-site by other friends. To all of them: big thank you!
Scuba tank storage and access to 
the bilges and  is made 

A new, Force 10 propane stove was installed
Countertops getting a new formica veneer

A gennaker system was added. Also a brand
new set of sails main, rf jib storm trysail
and  a storm jib had been purchased
New poly drinking water tanks are taking place
of the old aluminum ones

A new manual windlass and anchor roller system is added
Windpilot Pacific windvane was installed


A solar panel bridge and pushpit uniframe
with back seats was added.
A small folding cockpit table was made
All standing rigging and lifelines were replaced and a Tricolor
  masthehead navigation light added and the wiring replaced


The fuel tank received inspection/cleaning ports

No comments:

Post a Comment